In shortStart early. A business Internet line can take several weeks to install, and cabling is easier before the furniture arrives. Here is the checklist to follow, in order.

1. Visit the space with a technician

  • Where will the network room be? Check the space, ventilation and power outlets.
  • Is there existing cabling? If it is in good condition and passes testing, it can sometimes be kept.
  • What are the ceilings like (suspended, open, concrete)? That is what changes the price most.
  • Where does Internet come into the building?

2. Order Internet as soon as the lease is signed

  • Ask the provider for the installation date. It is often the longest lead time.
  • Plan a backup line if your work cannot stop.

3. Count what needs to be connected

  • One or two drops per workstation (computer and phone).
  • One drop per Wi-Fi access point, camera, printer or card reader.
  • Add 20% spare capacity: it costs less than coming back later.

4. Think about security at the same time

Cameras, access control and the alarm run through the same ceilings. Cabling them during the same work costs less than reopening the ceilings later.

5. Plan the schedule

  1. Cabling and testing while the space is empty.
  2. Installation of the cabinet, switches and Wi-Fi access points.
  3. Moving the computers, ideally over a weekend.
  4. Checking every workstation on the first business day.

6. Don’t forget the old space

Collect your network equipment and your data, and check what the lease requires when you leave.

Frequently asked questions

When should we start?

As soon as the lease is signed: order Internet and have the space visited.

Should cabling be done before the furniture arrives?

It is better: access is easier and the work goes faster.

How much does it cost?

Get a first estimate with our free estimator, then ask for a site survey.